Custom Chandeliers
Most of our chandelier series can be made in other sizes, lamp-head counts, metal finishes and colour temperatures, and our design team can develop a new piece from your drawing. Design, glass, metalwork and assembly happen in our own factory in Zhongshan, China.
Factory direct · MOQ 50 units · 35–45 days production
Choose a style and size, then tell us the quantity and destination for a project quote.
Series we build to size

Multi-Tier Chandelier 8503

Glass Multi-Tier Chandelier 8329

MD8601 Linear Pendant Series

8332 Stair Pendant Light Series

8343 Pendant Light Series

Geometric Chandelier 8326

Glass Chandelier 8328

MD8505 Pendant Light Series
AURORA hand-blown crystal pieces

AURORA Glass Chandelier 002

AURORA Glass Chandelier 004

AURORA Glass Chandelier 005
How a custom chandelier is made
What can be changed
Overall size, number of lamp heads, drop length, metal finish, glass colour and colour temperature. Send us your requirements and we confirm what is feasible for each series in the quotation.
New designs from your drawing
For a design that is not in our catalogue, send a drawing, a reference photo or a brief. Our design team develops the drawings with you before anything is produced.
Samples before production
Samples take about 25 days. Sample cost and freight are quoted per order and can be credited against the bulk order.
Large crystal installations
For lobby centrepieces and other large pieces, our AURORA studio hand-blows the glass in-house. The white crystal chandelier in the lobby of the W Hotel Xi'an is one of our projects.
FAQ
- Can you make a chandelier from my drawing?
- Yes. We develop products for distributors, brands and projects, and our design team can develop a new series from your brief or drawing.
- What is the minimum order for a custom chandelier?
- The standard minimum is 50 units per model. Customised versions may need a higher quantity; tell us the design and quantity and we confirm it in the quotation.
- How long does a custom chandelier take?
- Samples take about 25 days. Production takes 35–45 days for a full container (40HQ / 20GP); large or heavily customised orders are confirmed in the quotation.
- Are your chandeliers certified?
- Our products are tested to CE, ETL and RoHS requirements, and we can prepare plugs and documentation for your market.
Get a project quote
Tell us the models, quantities and destination. We reply within one working day with prices, options and lead time.
